Paintwork Auckland

Guide

How to read and compare three painting quotes

Three quotes for the same house usually describe three different jobs. Until you have made them describe the same job, comparing the totals tells you nothing — and the cheapest one is cheapest for a reason that is written down somewhere in the document.

$163,752
Average declared value of an Auckland dwelling alteration consent — 4350 consents in the 12 months to 2026.05. It is the applicant’s own estimate, it excludes land, and it is not a painting price. It is here as the only published sense of the scale of discretionary work Aucklanders consent. Why it cannot be turned into a rate.

Stats NZ — Building consents issued, May 2026 · May 2026

First

Make the three quotes describe the same job

Seven lines. If a quote is silent on any of them, that silence is where the price difference is hiding — and asking is free.

  1. Preparation, described specifically. "Prepare surfaces" is not a scope. Washing, scraping, sanding, filling, timber repair, priming bare areas and spot-priming are separate operations with separate costs. What each one involves.
  2. Number of coats, and of what. One coat over a sound existing finish is a legitimate job. It is not the same job as a primer plus two topcoats, and the two should never appear as one line called "painting".
  3. The product, by name. Not "quality paint" — the manufacturer and the product line. This is also what lets you read the application limits yourself.
  4. Cladding treatment. Weatherboard and monolithic need genuinely different work. A quote that prices both at one rate has not looked at your house. Why.
  5. Access and scaffolding. Who pays for it, for how long, and what happens if the job runs past the hire period.
  6. What is excluded. Joinery, gutters, soffits, fascia, downpipes, garage doors, fences and decks are all commonly outside an "exterior repaint" and all commonly assumed to be inside it.
  7. What happens if the substrate is not sound. The single most useful question you can ask. A quote with no variation clause for rotten timber is not a fixed price, it is an optimistic one.
34% New Zealand houses with more than one cladding type — which is why one rate rarely covers a whole building

BRANZ Study Report SR142, House Condition Survey 2005 · 2005

40% of New Zealand houses were found to have deteriorating exterior paintwork — the condition that decides how much preparation your quote should contain

BRANZ Study Report SR456, House Condition Survey · 2020

Then

Work out what the labour in the quote plausibly is

You cannot derive a price from published data. You can sanity-check the labour, because real trade pay is published — and it is the largest single component of a repaint.

Published pay for painters and decorators in New Zealand
BandHourly
Lower$24.04
Median$29.81
Upper mid$36.06
Upper$45.19

The pay you see here is your pay before tax. When an employer pays you, Inland Revenue (IR) collects a percentage of that income. Learn more about income tax on the IR website

Tertiary Education Commission — Tahatū Career Navigator · 2026-07-30

This is what a painter is paid, not what a job is charged at. A charge-out rate has to carry ACC, holiday pay, vehicle, scaffolding, insurance, materials, quoting time, unpaid weather days and profit on top of it. Anyone who tells you the multiplier is a specific number is guessing; what the pay band gives you is a floor, and a way to tell whether a quote implies a labour rate that no business could actually run on.

Work out roughly how many days each quote implies, and see what hourly figure the total leaves once materials and scaffolding are removed. If the answer is below the lower band above, either the days are underestimated or something in the scope is missing. The rate data in full.

$41.41/hr Construction ordinary-time average hourly earnings, 2026.03 quarter — up 9.6% in real terms over ten years

Stats NZ — Labour market statistics, Quarterly Employment Survey, March 2026 quarter · March 2026 quarter

-9% real change in the price paint manufacturers charge for paint, over the same ten years. The paint is not what got more expensive.

Stats NZ — Business price indexes (PPI and Capital Goods Price Index), March 2026 quarter · March 2026 quarter

Finally

The questions that separate the three

Once the scopes match, four questions usually decide it, and none of them is about price.

"What will you do if you find rot?"

You want a described process and a rate, not reassurance. If the answer is "we'll sort it", the price you have been given is provisional. Where the repair turns out to be restricted building work under the Building Act 2004, it must be carried out or supervised by a Licensed Building Practitioner — that is a different trade and a different quote.

"How many usable days do you think this needs, and when?"

An exterior repaint needs a run of days, not one good one. A painter who has thought about the Auckland calendar will say so. How many usable days a month actually contains.

"What is the product, and what does its datasheet say?"

Coatings have published application limits — minimum and maximum air temperature, maximum humidity, a margin above dew point, and a rain-free window after application. A painter who works to them will tell you the numbers. One who says the weather does not matter is telling you something else.

"What is in writing?"

Scope, exclusions, product, coats, variation rate, and how payment is staged. Anything agreed verbally on a driveway is not a comparison you can hold.

Three quotes, three scopes. The comparison is the work.

Photography commissioned — plate reserved · July 2026

Questions people actually ask

How many quotes should I get?

Three. One is not a comparison, and the fifth rarely adds anything the third did not. What matters far more than the count is that all of them are quoting the same scope.

Should I just take the cheapest?

Only after establishing that it is the same job. A cheaper quote is cheaper for a reason written down somewhere in it: fewer coats, less preparation, no scaffolding, joinery excluded. Find the reason, then decide whether you agree with it.

Is a big spread between quotes a red flag?

Not on its own — it usually means the job has been scoped differently rather than priced differently. The quote well below the others has often assumed the substrate is sound. Ask what happens to the price if it is not.

Can you tell me whether my quote is reasonable?

We can tell you whether the scope is complete, what is missing from it, and whether the implied labour is plausible against published pay bands. We will not tell you a per-square-metre benchmark, because no honest source for one exists. Send the details.